Case studies
VPP case studies
Real programs, real numbers. Snapshots of how virtual power plants have performed, plus the deep-dive device studies from our sister sites.
VPP Economics has no affiliation with, sponsorship from, or endorsement by any utility, aggregator, platform, or device maker named here.
VPPs in the field
Record VPP, uncertain funding
California’s Demand Side Grid Support program set a 745 MW home-battery record in October 2026, yet its funding is set year to year. Sponsor-commissioned studies put benefits at 1.4–1.9 times costs.
Read the case study →New England · ConnectedSolutionsA decade of paying for performance
About 350 MW of batteries, thermostats and businesses in Massachusetts, paid per kW actually delivered at a five-year locked battery rate of $275 per kW.
Read the case study →Puerto Rico · LUMAExisting batteries as emergency supply
Households bought batteries for backup; LUMA auto-enrolled them. Enrollment jumped from 7,602 to more than 90,000 at an unchanged pay rate, delivering about 35 MW per event for roughly $263 per kW.
Read the case study →Hawaii · Battery BonusPaying for committed kW after coal
Hawaiian Electric paid $850 per kW upfront for new home batteries to run every evening after Oahu’s coal plant closed. Customers committed 50.76 MW; the utility estimates about 15 MW was shifted.
Read the case study →San Diego · Community PowerWhen the money runs out fast
An $11.5 million upfront battery rebate sold out in about three months: 2,200 batteries, 7.3 MW, about $1,575 per kW, and a relaunch built to pace the budget.
Read the case study →Device deep dives from the Ownership Economics family
Home battery VPP earnings: 17 programs compared
$1,800–$11,200 over 10 years for the same 13.5 kWh battery.
Read →Battery EconomicsHome battery under a time-of-use rate: 12 utilities
What a battery saves on the bill before any VPP payment.
Read →Battery EconomicsHosted batteries: Base Power & Energywell
A free battery in exchange for an electricity contract.
Read →Heatpump EconomicsHeat pump virtual power plant programs
14 thermostat programs; $210–$955 over 10 years.
Read →Heatpump EconomicsHeat pump water heaters as VPP assets
8 programs; $130–$1,300 over 10 years.
Read →Drive EconomicsV2G buyer’s guide: vehicles, chargers, programs
Which EV and charger pairs can export to the grid in 2026, what programs pay, and gross vs. net value.
Read →In development
Full VPP Economics case studies on whole-home stacking — a battery, EV, thermostat, and water heater in the same house, in specific geographies — are being built from the program registry behind Find a Program.