Home / Resources
Glossary
VPP glossary
33 terms from the virtual power plant world, explained in plain English — every acronym spelled out.
A
- Aggregator
- A company that enrolls many devices or sites and sells their combined flexibility to a utility or market, usually keeping a share of the revenue.
- Ancillary services
- Short-term grid services such as frequency regulation and reserves that keep supply and demand balanced second to second.
B
- Baseline
- The estimate of what you would have used without an event. Your performance — and pay — is measured against it.
- Behind the meterBTM
- Equipment on the customer’s side of the utility meter, such as a home battery or rooftop solar.
- Bring your own deviceBYOD
- A program that pays you to enroll equipment you already own, rather than providing it.
C
- Capacity
- The ability to deliver power when needed, measured in kilowatts (kW) or megawatts (MW). Most VPP pay is for capacity.
- Capacity market
- A market, such as PJM’s, where grid operators pay resources to be available at peak years in advance.
- Curtailment service providerCSP
- PJM’s term for a demand response aggregator.
D
- Demand charge
- A commercial bill charge based on a customer’s highest power draw in a month, often a large share of the bill.
- Demand responseDR
- Reducing or shifting electricity use when the grid is stressed, usually in exchange for payment.
- Demand Side Grid SupportDSGS
- A California state program that pays customers and aggregators to reduce load or discharge batteries during grid emergencies.
- DER management systemDERMS
- Utility software that monitors and controls distributed resources to keep the local grid within limits.
- Dispatch
- An instruction for a resource to change output or consumption at a specific time.
- Distributed energy resourceDER
- A small-scale device that produces, stores, or flexibly uses electricity — batteries, solar, EVs, thermostats, water heaters.
- Distribution deferral
- Value from avoiding or delaying upgrades to local wires and transformers by reducing peak load in that area.
E
- Emergency Load Reduction ProgramELRP
- A California utility program that pays $2 per kWh of load reduced or exported during grid emergencies.
- Event
- A period, usually 1–4 hours, when a program calls on enrolled devices.
F
- Federal Energy Regulatory CommissionFERC
- The federal agency that regulates interstate electricity transmission and wholesale markets.
- FERC Order 2222
- A 2020 federal rule requiring regional grid operators to let aggregations of distributed resources as small as 100 kW participate in wholesale markets.
I
- Independent system operatorISO
- An organization that operates the grid and wholesale market in a region, such as CAISO, ISO-NE, NYISO, MISO or ERCOT.
K
- Kilowatt / kilowatt-hourkW / kWh
- A kilowatt measures power at an instant; a kilowatt-hour measures energy over time. A 5 kW battery running for 2 hours delivers 10 kWh.
L
- Load shifting
- Moving electricity use from expensive hours to cheaper ones, such as heating water at midday instead of 6 p.m.
M
- Managed charging
- Adjusting when and how fast an EV charges to avoid peak hours, either by schedule (passive) or real-time control (active).
O
- Opt out
- Choosing not to participate in a specific event. Many programs allow it but may reduce pay.
P
- Peaker plant
- A power plant, usually gas-fired, that runs only during the highest-demand hours. VPPs compete with peakers.
- Performance payment
- Pay based on the measured kW or kWh your device actually delivered during events.
- Pre-cooling / pre-heating
- Running a heat pump or air conditioner harder before an event so the home stays comfortable while it is turned down.
Q
- Qualified scheduling entityQSE
- An ERCOT market participant that submits schedules and receives payment on behalf of resources.
R
- Regional transmission organizationRTO
- A grid operator covering multiple states, such as PJM or MISO. Often used interchangeably with ISO.
- Reserve (backup)
- The share of a battery’s charge kept for outages and not dispatched in events.
T
- Time of useTOU
- A rate that charges more for electricity at peak hours and less off-peak.
V
- Vehicle-to-gridV2G
- Bidirectional charging that lets an EV send power back to the grid.
- Virtual power plantVPP
- A group of distributed resources coordinated by software to act like a single power plant.