The short answer
- NYSEG and RG&E run the same business programs at slightly different prices. The Commercial System Relief Program (CSRP) pays a reservation of $4.10 per kW-month at NYSEG and $4.25 at RG&E from May through September, plus $0.50 per kWh in events.
- A business can double dip, legally. The PSC lets a site enroll in both CSRP and NYISO’s Special Case Resource (SCR) program, because CSRP pay excludes wholesale capacity value. What it can’t do is combine CSRP with a multiyear DLM contract, or SCR with NYISO’s DER aggregation model.
- The location-based money is missing. Term-DLM and Auto-DLM, the contracts that pay most at National Grid, have drawn no bids at NYSEG or RG&E for any summer from 2021 to 2026.
- A business battery pays back in about 8.1 yr. With NYSERDA’s $175 per kWh incentive, the federal credit, SC2 demand savings, CSRP and SCR, a hypothetical 100 kW / 400 kWh battery clears ten years with cash to spare. The demand charge does most of the work.
Who does what
NYSEG and RG&E are separate regulated utilities owned by Avangrid. For businesses the split matters in two places: the rate each pays under its own tariff, and the program prices, which differ by a few cents. Program rules, enrollment and annual reporting are shared.
Three tracks
Where the money comes from, who sets the rules, and what reaches a business.
Swipe to see the full chart →
Side by side
Where the two utilities’ business programs differ, and what they share.
Swipe to see the full chart →
What makes this territory different: a DLM program nobody bids into
Every deep dive on this site has one feature that changes how its economics read. For NYSEG and RG&E business customers it is an empty auction. New York’s utilities pay for flexibility in two ways: systemwide programs every summer, and multiyear Dynamic Load Management (DLM) contracts. Elsewhere in upstate New York, DLM contracts carry the best prices, because they target overloaded feeders.
At NYSEG and RG&E, Term-DLM and Auto-DLM offer an incentive rate of $25.50 per kW-year plus $0.50 per kWh under three- to five-year contracts (NYSEG RFP). They drew no bids for any summer from 2021 through 2026, and the Distribution Load Relief Program (DLRP) reservation price is $0, so it has no enrollments (NYSEG and RG&E). A business here earns from CSRP, NYISO and its own bill. The value of local grid relief shows up instead in NYSEG’s own procurements: a bulk storage solicitation and a non-wires alternative for the Liberty area (Liberty area RFP).
Programs by asset
NYSEG and RG&E business programs and NYISO options, October 2026.
Swipe to see the full chart →
Can a business double dip?
Yes, within limits. New York separates services: the utility pays for relief on its own system, and NYISO pays for statewide capacity and energy. A site can be paid for both, as long as no one pays twice for the same kilowatt of the same service.
Five combinations
Which payments can be combined at one business site, and why.
Swipe to see the full chart →
The key ruling dates to 2015. NYSEG, RG&E and Central Hudson argued that paying hourly-pricing customers in CSRP would be a double payment. The PSC disagreed: customers may enroll in both CSRP and SCR, and avoided wholesale capacity value should be left out of CSRP pay when another program already provides it (PSC order). Aggregators such as CPower market the stack (CPower).
Stacking needs care, depending on M&V methodology. CSRP and SCR both measure reductions against customer baselines from interval data; a battery that shaves the same afternoon peak every day lowers its own baseline and shows less event reduction.
What a flexible kilowatt is worth
Value per kW-year
What one kW of reliable reduction or event delivery is worth a year at a NYSEG or RG&E business site.
Swipe to see the full chart →
Demand charges are worth several times any program. NYSEG’s SC2 general service rate charges $18.04 per kW-month on monthly peak demand (NYSEG rates), about $216 per kW-year if a battery shaves the same peak every month. CSRP adds about $34 at NYSEG and $35 at RG&E, and SCR about $28 before the aggregator’s share. Capacity hit a record $7.90 per kW-month in May and June 2026 (Potomac Economics), so SCR pay swings with the auction.
Building controls
$4.10–$4.25 per kW-month reservation plus $0.50 per kWh; performance factor of at least 25%.
Battery
$18.04 per kW-month on SC2 demand, plus both demand response programs.
Large loads
Capacity pay through an aggregator; stacks with CSRP.
Aggregations
100 kW minimum on one transmission node; dual participation with CSRP allowed.
If the business adds a battery
NYSERDA pays retail storage incentives for batteries that cut demand charges or join demand response, at $175 per kWh in the current Rest of State block (NYSERDA via Central Hudson). On a hypothetical 100 kW / 400 kWh battery that is $70k.
Capital stack
Ten years of incentives, savings and program pay as a share of cost plus ten years of maintenance.
Swipe to see the full chart →
Payback
Simple payback in years after NYSERDA and the federal credit.
Swipe to see the full chart →
Own, borrow or buy a battery service
The all-streams case. Money in and out of the site, then cumulative cash over 10 years.
Swipe to see the full chart →
The developer’s side
The site’s line above is only half of the deal. The developer pays the full $240k, carries maintenance, insurance and performance risk, and prices all of it into the contract to earn a return on its capital (Morgan Lewis). Third-party storage contracts usually run 15 years or more (Peak Power), and lenders treat 15- to 20-year terms as financeable (Illinois Power Agency). The chart below values each deal from the developer’s side.
What the developer earns
Present value of what the developer receives, as a share of what it spends, by contract terms.
Swipe to see the full chart →
With 25% of savings left to the site, a 15-year deal covers about 85% of the developer’s cost on our model. At the modeled cost, a developer cannot earn 8% and still leave the site a share of demand savings. Battery-service offers are not priced the other way around, as a fee on top of handing over the savings: shared-savings providers promote a guaranteed share from day one (Gridwealth Electric), and Peak Power’s projects in Westchester, New York, split bill savings and market revenue with the building owner (NYSERDA case study). A deal that cannot fund a share is usually not offered at all. A guaranteed 15% share would need an installed cost about 22% lower, near $187k, or a larger site where cost per kWh falls; providers such as Peak Power focus on facilities with more than 1 MW of load (Peak Power’s overview). The battery-service line above shows that 15% share. NYSERDA’s upfront incentive and a high demand charge still make NYSEG one of the stronger upstate cases for a business battery that the site owns, even without a DLM contract.
An exporting battery has another path: the Value Stack, New York’s compensation for distributed energy, whose Alternative 3 capacity rate for NYSEG is about $5.06 per kW-month (Gaiergy). It does not combine with selling the same exports to NYISO.
Where NYSEG and RG&E go next
The two utilities received requests for almost 500 MW of new load in 2024 (Avangrid’s Senate testimony). The future of VPP to grow at scale will depend on multiple assets in unison at any given site: building controls, thermal storage, EV charging and batteries, dispatched together. For businesses, the next steps are a DLM price that attracts bids, NYISO’s Order 2222 rules at the end of 2026, and final rate orders that set the next demand charges.
Compare: the National Grid C&I deep dive for DLM contracts that do clear, and the Con Edison C&I deep dive for New York City’s higher capacity prices.
Method and caveats
An independent, hypothetical analysis for business owners, facility managers, program designers, developers and other readers in NYSEG and RG&E territory. Terms checked October 30, 2026.
Assumptions for the hypothetical battery: 100 kW / 400 kWh at $600 per kWh; $15 per kW-year maintenance; NYSEG SC2 demand of $18.04 per kW-month with 50 kW off the monthly peak; NYSERDA at $175 per kWh; federal credit at 30% of cost after NYSERDA; CSRP at $4.10 per kW-month for five months plus 7 four-hour events at $0.50 per kWh; SCR at $4.70 per kW-month for six summer months with 70% kept by the site. Winter SCR pay is not counted. The developer figures price a 15-year third-party agreement at an 8% after-tax return.
Figures are gross savings and program payments before taxes on savings, financing and degradation. Gross payments are not net profit. CSRP, DLRP and SCR are event-based demand response, not orchestrated VPPs. Stacking needs care, depending on M&V methodology.
VPP Economics has no affiliation with, sponsorship from, or endorsement by NYSEG, RG&E, Avangrid, Iberdrola, NYISO, NYSERDA, CPower or any company named here.
Sources
NYSEG, RG&E and Avangrid
- NYSERDA GridConnect — NYSEG and RG&E utility profile
- Avangrid — Avangrid Networks
- NY PSC — Temporary rates for NYSEG and RG&E
- NYSEG and RG&E — Corporate Responsibility Report
- Fitch Ratings — NYSEG and RG&E on Rating Watch Negative, October 2026
- NY DPS — NYSEG and RG&E rate filing summary, July 2025
- Daily Energy Insider — PSC sets temporary rates for NYSEG and RG&E
- WXHC — PSC approves smaller-than-requested rate increases
- The Flaw — Investor-owned utilities and the power imbalance
- Avangrid — Testimony to the New York State Senate, November 2025
- NYSEG and RG&E — Annual demand response report, November 2025
- NYSEG and RG&E — Demand response annual report, April 2026
NYISO and wholesale markets
- NY DPS — Benefit-cost analysis handbook, NYISO zone table
- NYSEG — NYISO zone maps
- NYISO — Subzone definitions
- NYISO — Power system fundamentals
- NYISO — DER and aggregation participation model FAQ
- NYISO — FERC Order No. 2222 compliance overview
- FERC — Order on NYISO’s DER participation model
- NYISO — Informational filing on the DER participation model, April 2026
- NYSEG — Distributed energy resources aggregation
- NYISO — DER aggregations and dual participation, 2017
- Potomac Economics — NYISO quarterly report, Q2 2026
- NY DPS — 2026 summer preparedness
- Modo Energy — NYISO capacity prices hit records for summer 2026
- Modo Energy — NYISO in July 2026
- NY PSC — Order adopting dynamic load management filings, June 2015
- CPower — New York energy market
NYSERDA and state incentives
- NYSERDA — Overview of utility residential storage demand response programs (January 2026)
- NYSERDA via Central Hudson — NY-Sun and energy storage updates, 2026
Business programs and rates
- NYSEG — Commercial System Relief Program
- NYSEG — Commercial and industrial demand response
- NYSEG — Term-DLM and Auto-DLM request for proposals
- Get Energy Rebates — New York commercial energy incentives
- NYSEG — Electricity rates summary, June 1, 2026
- Gaiergy — VDER Alternative 3 ICAP explainer
Costs and finance
- Solar Cost Data — Energy tax credits in 2026
- Peak Power — Financing strategies for battery storage (third-party contract terms)
- Illinois Power Agency — Energy Storage Procurement Report (financeable contract tenors)
- Morgan Lewis — Shared-savings contract structures for energy storage
- Plante Moran — Battery storage investment tax credit after 2025
- Ferrius Energy — Storage depreciation and basis reduction