The short answer

  • In Con Edison territory, demand charges beat demand response. Large commercial delivery demand costs $44.05 per kW in summer months and $34.50 in winter on SC9 Rate I, about $450 per kW-year (DEKALOS, from Con Edison’s tariff). The richest stack of Con Edison’s two relief programs pays $180 to $215 per kW-year (Con Edison).
  • The relief programs are still unusually rich. The Commercial System Relief Program (CSRP) and the Distribution Load Relief Program (DLRP) pay $18 to $25 per kW-month from May to September in most of NYC, plus $1 per kWh during events. They can be stacked with the same aggregator (Rider T guidelines).
  • A behind-the-meter battery can pay back in about 3 to 7 years in NYC once the NYSERDA incentive, the 30% federal credit and the city’s property tax abatement are layered on. Without incentives, it takes about 7 to 16 years.
  • The traps are baselines, penalties and irreversible choices. Daily peak shaving lowers the customer baseline that relief is measured against. Term-DLM can invoice an aggregator for poor performance. Value Stack customers must permanently give up DRV and LSRV to join (Con Edison DLM RFP, Con Edison).
$18–$25per kW-month, CSRP/DLRP, most of NYC
$44.05per kW, summer SC9 Rate I demand
$32.60per kW-month, record NYC capacity, May 2026
$638/kWhaverage NY behind-the-meter storage cost

What each program is

Day-ahead DR

Commercial System Relief Program (CSRP)

Four-hour events in a network’s assigned call window (11–3, 2–6, 4–8 or 7–11) on summer weekdays. Day-ahead advisory at least 21 hours ahead, triggered at 92% of forecast system peak or a high temperature variable (Rider T guidelines). $6 per kW-month in Staten Island and Westchester, $18 elsewhere, plus $1 per kWh (Con Edison).

Contingency DR

Distribution Load Relief Program (DLRP)

Network-level emergencies with two hours’ notice or less, any day from 8 a.m. to midnight, including weekends. Four-hour mandatory performance. $18 per kW-month, or $25 in Tier 2 priority networks (Con Edison).

Contracted DR

Term-DLM and Auto-DLM

Three- to five-year contracts at a pay-as-bid $/kW rate plus $1 per kWh. The annual payment is rate × kW × average performance factor, and it can go negative: Con Edison’s example invoices $8,000 to an aggregation that underperforms (Con Edison). For the 2024 vintage, Con Edison accepted 5.6 of 14.6 MW bid into Term-DLM and 8.5 of 95.8 MW into Auto-DLM (Con Edison DR report).

Wholesale capacity DR

NYISO Special Case Resources

Aggregators can also enroll load in NYISO’s capacity market. Dual enrollment with Con Edison programs is allowed, but a customer using Con Edison as its NYISO aggregator is not paid Con Edison performance pay for overlapping events (Rider T guidelines).

Export compensation

Value Stack (VDER)

Pays exporting resources for energy, capacity, environmental value and distribution value. The DRV is $140.76 per kW-year (Phase Two) or $199.40 (Phase One) in Con Edison’s statement, paid only for exports in the applicable call window (Con Edison).

Price signal

Demand charges and time-of-day rates

SC9 bills most of a commercial delivery bill on monthly peak kW. One example bill RateMate cites put demand delivery at 77% of delivery charges ({a(RATEMATE, "RateMate")}).

Managed charging

SmartCharge Commercial

Fleet and site operators earn $10 per kW in summer and $2 in winter for avoiding the network’s four-hour peak, $17–$26 for public chargers, plus 3¢ per kWh charged overnight (Con Edison participant guide).

Upfront incentive

NYSERDA retail storage, PowerReady

NYSERDA pays $75 per kWh in NYC and $125 in Westchester for retail storage (KEEL, from NYSERDA’s block chart). PowerReady covers 50% to 100% of EV make-ready costs up to $400 to $800 per kW (Con Edison).

What a kilowatt is worth

Program pay, market value and demand charges per kW-year

Con Edison commercial DR programs (green), wholesale and Value Stack references, and the demand charge a battery can avoid.

Swipe to see the full chart →

$0$100$200$300$400$500CSRP, Staten Island & Westchester$6/kW-month × 5$30SmartCharge Commercial, standard$10 summer, $2 winter /kW (est.)$56CSRP, other boroughs$18/kW-month × 5$90DLRP, Tier 1–Tier 2$18–$25/kW-month × 5$90–$125Term-DLM, RFP examplepay-as-bid, 3–5 year contracts$100NYC capacity, summer 2026 (est.)monthly spot, May–Oct$125Value Stack DRVPhase Two–Phase One$141–$199CSRP + DLRP stackedother boroughs, Tier 1–2$180–$215SC9 Rate I demand charge$44.05 × 4 + $34.50 × 8$452
Sources: Con Edison Smart Usage Rewards; Con Edison DR incentive rates; Term-DLM RFP; SmartCharge Commercial guide; Value Stack statement; NYC capacity from Modo Energy and REsurety; demand charges from DEKALOS and RateMate. The SmartCharge Commercial row assumes the per-kW rates apply each month. The demand-charge bar assumes 1 kW cut from every monthly peak.

The demand charge is the biggest number because it applies every month to the single highest 30-minute peak. A battery or load control that reliably trims that peak earns about $450 per kW-year on SC9 Rate I, more than twice the best DR stack. The relief programs pay for five summer months and a handful of events; the Value Stack pays only for exports in narrow windows. NYC capacity prices are high but volatile: spot prices averaged $32.56 per kW-month in May and June 2026 before falling to $12.41 in July (Potomac Economics, REsurety).

Scenario: a 500 kW / 2 MWh battery in NYC

Annual value by revenue stream

Three cases for a four-hour battery at a commercial building on SC9 Rate I.

Swipe to see the full chart →

$0k$60k$120k$180k$240kConservative150 kW shaved · CSRP only$78,630 net of O&MCentral250 kW · CSRP + DLRP T1$173,550 net of O&MAggressive300 kW · CSRP + DLRP T2$219,760 net of O&MDemand charge reductionCSRP/DLRP reservation + $1/kWhEnergy shifting
Illustrative. Demand charges at $452 per kW-year (DEKALOS); CSRP $90 and DLRP $90–$125 per kW-year (Con Edison); 32 event hours a season at $1/kWh; energy shifting from NYSERDA’s behind-the-meter study; operations and maintenance (O&M) of $15/kW-year (IndexBox). DR kW is the amount pledged beyond routine peak shaving.

Why demand reduction leads. In the central case, cutting 250 kW from each monthly peak is worth about $113,050 a year, against about $53,000 from CSRP and DLRP. That ordering shapes the dispatch strategy: protect the monthly peak first, then pledge only the kW left over for DR events.

The baseline overlap. Con Edison measures relief against a customer baseline load (CBL) built from the 10 most recent eligible weekdays (Rider T guidelines). A battery that shaves every afternoon has already lowered that baseline, so only power beyond routine shaving counts as event relief. That is why the scenarios pledge less DR kW than the battery’s full 500 kW.

Window fit. CSRP call windows are assigned by network. A building in an 11 a.m.–3 p.m. network can often serve its own peak and the event with one discharge. A building in a 7–11 p.m. network may need a second charge on event days, which is harder with a four-hour battery.

Simple payback by incentive layer

Bars run from the central-case payback to the conservative-case payback.

Swipe to see the full chart →

0 yr3 yr6 yr9 yr12 yr15 yr18 yrNo incentivesnet cost $1,276,0007.4 yr–16.2 yrNYSERDA $75/kWh (NYC)net cost $1,126,0006.5 yr–14.3 yr+ 30% federal creditnet cost $788,2004.5 yr–10.0 yr+ NYC abatement ($250k cap)net cost $538,2003.1 yr–6.8 yrWestchester: $125/kWh + creditnet cost $718,2004.1 yr–9.1 yr
Installed cost $638 per kWh, the average for behind-the-meter stand-alone storage in New York’s 2026 State of Storage report (NY DPS). NYSERDA $75/kWh NYC and $125/kWh Westchester (KEEL). Federal credit at 30% of cost after the NYSERDA incentive (Solar Cost Data). NYC abatement at 30% of cost, capped at $250,000 over four years (NYC). Illustrative.

With every layer, the NYC case pays back in about 3 to 7 years. The NYC abatement is worth more than the NYSERDA incentive for a project this size: $250,000 against $150,000. NYSERDA’s NYC block has stepped down from $125 to $75 per kWh since 2025 (KEEL). Westchester has a higher NYSERDA rate but no city abatement.

Other C&I asset scenarios

Load curtailment, no battery

300 kW from building controls

Pre-cooling, lighting and fan setbacks pledged to CSRP and DLRP Tier 1 earn about $54,000 in reservations plus about $9,600 in event pay. Aggregators typically keep a share. The risk is the performance factor: an aggregation delivering nothing earns $0 for the season (Rider T guidelines).

+
Fleet depot

300 kW of managed charging

Avoiding the network peak at $10 per kW in summer and $2 in winter, plus 3¢ per kWh on about 600 MWh charged overnight, is worth roughly $35,000 a year (Con Edison). EV Phase-In rates soften demand charges for low-load-factor sites (Con Edison), and PowerReady covers make-ready costs.

+
Front-of-meter storage

5 MW / 20 MWh on the Value Stack

Modo Energy models Con Edison Value Stack revenue for a four-hour battery at up to $254 per kW-year in 2027, with DRV and capacity supplying 91% of 2026 revenue (Modo Energy). The Value Stack and Rider T exclude each other: choosing DR forfeits DRV and LSRV for the rest of the tariff term.

+
Solar + storage, C&I

Two revenue paths

Behind-the-meter storage at a solar site can shave demand or export under the Value Stack. NY DPS reports $673 per kWh for behind-the-meter storage paired with solar (NY DPS).

Behaviors and rules that drive results

Size

50 kW minimum

Direct participants need at least 50 kW of load relief; aggregators need 50 kW in total and 50 kW per declared aggregation. Pledges above 50% of historical peak trigger validation.

Notice

21 hours or 2 hours

CSRP is day-ahead with day-of confirmation. DLRP can come with two hours’ notice or less, seven days a week. Test events are mandatory for reservation participants.

Measurement

Ten-day baseline

Relief is measured against the average of eligible weekdays, with a weather adjustment capped between 0.8 and 1.2 (up to 1.8 in some cases).

Penalty risk

Term-DLM can go negative

Contract payments scale with the season’s average performance factor, and a negative result becomes an invoice. In 2023, Term-DLM event performance ranged from 66% to 90%.

One-way door

Value Stack vs Rider T

Enrolling a Value Stack customer in Rider T permanently gives up DRV and LSRV, and Value Stack customers are not paid per-kWh performance in CSRP or DLRP.

Overlaps

Paid once

Overlapping CSRP, DLRP and Term-DLM hours pay performance under one program only. When DLRP and Term-DLM overlap, DLRP gets the payment.

Financing and ownership

Own, borrow or buy it as a service

The central 500 kW / 2 MWh NYC case. Money in and out of the building, then cumulative cash over 10 years.

Swipe to see the full chart →

OWN IT OUTRIGHTCash−$1,276k installedday one+$150k NYSERDA incentive$75 per kWh, NYC+$338k federal credit30% §48E+$250k NYC abatementproperty tax, capped+$113k a yeardemand charge savings+$60k a yearDR + energy, net of upkeep10-year net cash$1,197kSite keeps every stream$BORROW THE NET COSTLoan=$0 down; incentives pay principalborrows $538k−$78k a year for 10 years8% interest+$174k a year, netsame savings and pay as cash−$245k of interestover the loan term10-year net cash$952kCash-flow testSTORAGE AS A SERVICEEnergy services=$0 capitalprovider buys the battery+$250k NYC abatementstays with the building=Provider keeps NYSERDA and the creditand CSRP, DLRP and energy value+$55k a year to the site49% of demand savings=15-year agreementpriced for an 8% return10-year net cash$804kNo capital at riskCumulative cash to the site, years 0–10−$1,000k−$500k$0k$500k$1,000k$1,500kyr 0yr 2yr 4yr 6yr 8yr 10Cashowns the batteryLoanowns the batteryEnergy servicesprovider owns it$245k of loan interestCash pays $538k net on day one
Illustrative, undiscounted. Central-case values from the scenario above; the abatement is treated as received upfront and stays with the building, which pays the property tax. Loan at 8% over 10 years on cost after incentives. The service split is priced so the provider earns 8% after tax over a 15-year agreement; the first 10 years are shown. IndexBox estimates service models at 30% to 40% of commercial installations (IndexBox).

The developer’s side

The site’s line above is only half of the deal. The developer pays the full $1,276k, carries maintenance, insurance and performance risk, and prices all of it into the contract to earn a return on its capital (Morgan Lewis). Third-party storage contracts usually run 15 years or more (Peak Power), and lenders treat 15- to 20-year terms as financeable (Illinois Power Agency). The chart below values each deal from the developer’s side.

What the developer earns

Present value of what the provider receives, as a share of what it spends, by contract terms.

Swipe to see the full chart →

0%50%100%150%30% to the site, 10 yearsa short contract102% · $1,398k vs $1,375k30% to the site, 15 yearssame split, longer term110% · $1,596k vs $1,457k30% to the site, 20 yearswith augmentation in year 11117% · $1,732k vs $1,476k49% to the site, 15 yearsmost the site can keep at 8%100% · $1,462k vs $1,457kCovers full costFederal credit, soldDepreciation tax valueNYSERDA incentiveCSRP, DLRP and energy valueDeveloper share of demand savings
Illustrative. Present value at an 8% after-tax return with a 27% combined tax rate; past the dashed line the developer earns at least 8%. Federal credit sold at 92 cents per dollar; storage still qualifies (Plante Moran). First-year depreciation on cost less upfront incentives and half the credit, which needs tax appetite (Ferrius Energy). Costs include maintenance plus 1% of installed cost a year for insurance and asset management. Savings held flat, with rate increases offsetting battery fade; the 20-year case adds a 10% augmentation in year 11.

New York City supports a real shared-savings deal. Demand charges above $34 per kW, CSRP and DLRP event pay and the NYSERDA incentive give a provider enough to earn 8% while leaving the building about 49% of demand savings over 15 years, or about 50% over 20. The 30% split clears 8% even on a 10-year term. The main risks run the other way: Champlain Hudson has already cut NYC capacity prices, Term-DLM performance can turn negative, and NYSERDA blocks keep stepping down.

Additional Finance Options and Considerations

Owner-financed

Keeps every stream

The building owner keeps demand savings, DR pay, the NYSERDA incentive, the federal credit and the abatement. That suits owners with tax appetite and long hold periods.

Energy services or storage-as-a-service

No upfront cost

The provider owns and operates the battery and shares about 49% of demand savings over 15 years. IndexBox estimates this model at 30% to 40% of commercial installations (IndexBox). The owner gives up most incentive value in exchange for no capital outlay.

Aggregator-only

Curtailment without hardware

A curtailment service provider enrolls existing controllable load and takes a share of CSRP and DLRP pay. This works best for large HVAC, refrigeration or process loads.

Tax-exempt owners

Check credit eligibility

Hospitals, universities and housing authorities should confirm whether they can monetize the federal storage credit, for example through elective pay. That changes the payback materially.

What ifs

Capacity

Champlain Hudson lowers NYC prices

The new 1,250 MW line reset July 2026 capacity to $12.41 per kW-month from about $32.50. Wholesale-dependent cases should assume lower summer capacity value from 2027.

Distribution value

DRV reform

Proposals before regulators range from Con Edison’s $252 per kW to $380 per kW from clean energy parties, and longer six- to eight-hour windows are under discussion (Joint Utilities filing).

Reliability gap

RADR contracts

Con Edison proposed Reliability Asset Dispatch Rights: 15-year fixed payments for distribution-connected batteries plus covered charging and interconnection costs, in exchange for full dispatch control, to help fill a projected 675 MW reliability gap (CBRE).

Rates

Demand charges keep rising

An 11.2% electric delivery rate increase took effect in January 2026 (Conduit). Higher demand charges raise the leading value stream directly.

Incentives

Blocks keep stepping down

NYC’s retail storage block has stepped down five times since 2025. Projects priced today should carry a cushion.

Permitting

Indoor batteries cost more

NYSERDA has estimated that high-rise NYC installations cost 10% to 50% more than suburban outdoor ones (NYSERDA). Faster permitting would lower that premium.

Households: see the Con Edison residential deep dive for Bring Your Own Battery, SmartCharge and rate choices.

Method and caveats

An independent analysis for building owners, facility managers, fleet operators, developers, aggregators and program staff. Program terms come from Con Edison tariffs, guidelines and RFPs, NYSERDA, and New York State and City sources linked above, checked October 25, 2026.

Illustrative assumptions: 500 kW / 2 MWh battery at $638 per kWh; SC9 Rate I demand delivery charges of $44.05 per kW (summer) and $34.50 (winter); 150–300 kW of monthly peak reduction; CSRP/DLRP pledges of the kW left after routine shaving; 32 event hours a season at $1/kWh; $15 per kW-year O&M; 30% federal credit on cost after the NYSERDA incentive; NYC abatement at its $250,000 cap.