Utility program deep dive · Hawaii

Hawaiian Electric C&I demand response and battery economics

Why oil-indexed energy dominates a Hawaii business bill, what Fast DR and BYOD Plus pay, and how a battery pencils out on Schedule P demand charges.

VPP Economics has no affiliation with, sponsorship from, or endorsement by any utility, aggregator, platform, or device maker named here.

The short answer

  • Oil sets the price of a business kWh. On Oahu, Schedule P charges about 35¢ per kWh, and about 29¢ of that is the monthly fuel and energy adjustment. For a typical large site, the demand charge is only about 17% of the bill.
  • The demand charge is still the best battery lever. At $32.04 per kW-month, Schedule P has one of the highest demand charges we model, worth about $384 per kW-year to a battery that shaves the same peak every month.
  • Fast DR is the only business demand response program. It pays $5 or $10 per kW-month plus 50¢ per kWh in events on Oahu and Maui. There is no wholesale market to stack with, and Hawaiian Electric’s own review found the program not cost-effective in 2025.
  • A business battery pays back in about 6.9 yr. With the federal credit, Schedule P demand savings and Fast DR, a hypothetical 100 kW / 400 kWh battery clears ten years with cash to spare. BYOD Plus pays $400 per kW upfront but costs energy on a flat rate.
29¢per kWh, fuel adjustment
$32.04per kW-month, Schedule P demand
35Fast DR customers, 5.26 MW
6.9 yrpayback, demand + Fast DR

Who does what

Hawaiian Electric’s three utilities serve businesses on Oahu, Maui County and Hawaii Island under Schedules G (small), J (medium) and P (large power), each priced by island (effective rate summary). The PUC approves every rate and program, and independent producers and aggregators sell to Hawaiian Electric under contract. Hawaii Energy, the state’s efficiency program, pays separate rebates (Hawaii Energy commercial rebates).

Three tracks

Where the money comes from, who sets the rules, and what reaches a business.

Swipe to see the full chart →

Money comes fromRules set byWhat customers getHawaiian Electricthree utilities,five island gridsBase rates plus monthly fuel andpurchased-power adjustments passedstraight to billsFiles tariffs, programs and gridplans; buys all power on each islandSchedule G, J and P rates, Fast DRpay, BYOD Plus for solar-chargedbatteriesHawaii PUCregulatorNo market prices: the PUC approvesevery rate, credit and programbudgetDER dockets set export credits, BYODPlus and time-of-use rate designApproval of each tariff a customercan joinSellers, partnersIPPs, aggregators,Hawaii EnergyIndependent producers sell undercontracts; aggregators under gridservices agreementsContracts approved by the PUC; noISO, no capacity or energy auctionEfficiency rebates from HawaiiEnergy; device control through PowerPartners
Simplified. Sources below.

What makes this territory different: oil sets the price

Every deep dive on this site has one feature that changes how its economics read. For Hawaiian Electric’s business customers it is the shape of the bill. On the mainland, a large site’s demand charge is often a third or more of the bill, and flexibility is mostly about cutting peaks. On Oahu, the energy cost recovery factor alone was 29.06¢ per kWh in October 2026 (Oahu ECRC filing), up from about 18¢ in early 2026. It passes fuel and purchased-power costs straight through, month by month.

Where the bill goes

Share of a monthly Oahu business bill by charge, October 2026.

Swipe to see the full chart →

0%25%50%75%100%Schedule P, 500 kW60% load factor$94k a monthSchedule P, 500 kW40% load factor$68k a monthSchedule J, 150 kW60% load factor$28k a monthDemand chargeOther per-kWh chargesFuel and energy adjustment
VPP Economics calculation for hypothetical sites from the October 2026 rate summary: Schedule P at $32.04 per kW-month and 35.44¢ per kWh, Schedule J at $15.72 and 38.78¢, with the 29.06¢ fuel adjustment shown separately. Customer charges and riders omitted. Sources below.

For a 500 kW site running at a 60% load factor, the demand charge is about 17% of the bill and the fuel adjustment about 68%. A battery can cut the demand charge, but on a flat energy rate it cannot cut the kWh: every kWh it stores is bought at the same price and loses about 10% in the round trip. Solar can cut it, and time-of-use rates would let a battery profit from shifting. The PUC’s advanced rate design study included business time-of-use schedules, with a default rollout still to be scheduled (PUC advanced rate design).

What a business can earn

Programs by asset

Hawaiian Electric and Hawaii Energy business programs, October 2026.

Swipe to see the full chart →

Existing loadBatteryGeneratorPayIslandsFast DR50 kW minimum, 10-minute responsecurtailmentconfirm termsMaui option$5–$10/kW-moOahu, MauiBYOD Plussolar-charged, daily window—$400/kW—upfrontall fivePower Partnerswater heaters via OATIwater heatersby partner—$2–$5/kW-moOahu, MauiHawaii Energy Power Movecommercial storage, 2024 rules—check status—per kWhOahu, MauiWholesale marketISO capacity or energynonenonenone—noneOfferedPartly or unclearThrough another companyNot offered
Terms from Fast DR program rules, Rule 33, Power Partners and the 2024 Power Move rules. Battery eligibility for Fast DR is not spelled out; confirm with the utility. Sources below.

Fast DR pays $5 per kW-month for up to 40 one-hour events a year or $10 for up to 80, plus 50¢ per kWh reduced, adjusted for performance, for sites that can drop at least 50 kW within 10 minutes on weekdays from 7 a.m. to 9 p.m. (program rules). A 50 kW site earns at least $3,000 a year whether or not an event is called (Fast DR FAQ). In 2025 it had 35 customers and 5.26 MW, mostly military sites, hotels, condominiums, retailers and a water utility, and paid $427,658 in incentives; Oahu spent about $326,000 of a $1.21 million budget (2026 CER report).

BYOD Plus is open to commercial customers with a new battery charged from on-site renewables, at $400 per kW upfront (BYOD Plus tariff). In 2024, Hawaii Energy’s Power Move added rebates of up to $250 per kWh for commercial batteries dispatched from 6 to 8:30 p.m. alongside Battery Bonus (Power Move rules); check whether a current cycle pairs with BYOD Plus.

+
Fast DR

Building loads

$5 or $10 per kW-month plus 50¢ per kWh; 50 kW minimum; 10-minute response; Oahu and Maui.

Demand charge + Fast DR

Battery

$32.04 per kW-month on Schedule P demand, plus Fast DR if accepted.

+
BYOD Plus

Solar-charged battery

$400 per kW upfront for a daily two-hour discharge window over five years.

+
Power Partners

Multifamily water heaters

Monthly credits per kW through Shifted Energy under OATI’s agreement.

Can a business stack programs?

Stacking here means combining the bill, Fast DR, BYOD Plus and the federal credit. With no wholesale market, there is no capacity payment to add and no double-pay rule to navigate between the utility and an ISO.

Five combinations

Which payments can be combined at one business site, and why.

Swipe to see the full chart →

Funding source combinationWhyDemand savings + Fast DRbill and event payFast DR pays for reductions within 10 minutes of a call; a batteryshaving the monthly peak does a different job.StacksBYOD Plus + demand savingsone battery, two jobsAllowed if the battery holds enough energy for both the daily window andthe site’s monthly peak.StacksBYOD Plus + Fast DRtwo grid services programsNot addressed in the public rules; moving between grid services programsforfeits a second upfront incentive.PartlyFederal credit + BYOD Plustax credit and utility incentiveStorage still qualifies for the federal credit; a utility incentive mayreduce the cost basis.StacksUtility + wholesale marketthe mainland stackNo ISO operates on any island, so Fast DR and BYOD Plus are the onlygrid pay.No
VPP Economics assessment from Fast DR rules, Rule 33 tariff sheets and Solar Cost Data. Sources below.

Stacking needs care, depending on M&V methodology. Fast DR measures reductions against a 10-day average baseline, and BYOD Plus verifies a daily two-hour discharge from the battery’s own data. A battery that runs every evening for BYOD Plus raises its own evening baseline in Fast DR.

What a flexible kilowatt is worth

Value per kW-year

What one kW of reliable reduction is worth a year at an Oahu business site.

Swipe to see the full chart →

$0$100$200$300$400Schedule P demand charge$32.04 per kW-month × 12$384Schedule J demand charge$15.72 per kW-month × 12$189Fast DR, 80 events$10 per kW-month + events$126Fast DR, 40 events$5 per kW-month + events$66BYOD Plus upfront$400 per kW over 5 years$80
Demand charges from the Schedule P rate table; Fast DR from its published terms with 13 event hours, Oahu’s 2025 count; BYOD Plus from the Rule 33 text, spread over its five-year commitment. Sources below.

The Schedule P demand charge is worth about $384 per kW-year, more than three times Fast DR’s top tier. BYOD Plus looks generous upfront but asks for 200 kWh of discharge every day from a 100 kW commitment. On a flat 35¢ energy rate, the round-trip losses on that cycling cost about $3k a year, which offsets much of the incentive over ten years.

If the business adds a battery

Capital stack

Ten years of the federal credit, savings and program pay as a share of cost plus ten years of maintenance.

Swipe to see the full chart →

0%25%50%75%100%125%150%Demand + Fast DRboth streams130% · $331k vs $255kDemand onlySchedule P peak shaving104% · $264k vs $255kDemand + BYOD Plusnet of cycling losses103% · $263k vs $255kFast DR onlyno demand shaving54% · $138k vs $255kCovers full costFederal creditDemand charge savingsFast DR payBYOD Plus, net of losses
100 kW / 400 kWh at $600 per kWh plus $15 per kW-year maintenance; 30% federal credit, subject to construction-start rules (2026 tax-credit summary), on cost after BYOD Plus where it applies; 50 kW off the monthly Schedule P peak; Fast DR at $5 per kW-month on 100 kW with 13 event hours. Hawaii installed costs often run higher. Sources below.

Payback

Simple payback in years after the federal credit.

Swipe to see the full chart →

0 yr10 yr20 yr30 yr40 yrDemand + Fast DRboth streams6.9 yrDemand onlySchedule P peak shaving9.5 yrDemand + BYOD Plusnet of cycling losses9.4 yrFast DR onlyno demand shaving32.6 yr
Undiscounted, before taxes on savings. Sources below.

Own, borrow or buy a battery service

The demand + Fast DR case. Money in and out of the site, then cumulative cash over 10 years.

Swipe to see the full chart →

OWN IT OUTRIGHTCash−$240k installedday one+$72k federal credit30% of cost+$18k a yeardemand savings, net of upkeep+$7k a yearFast DR10-year net cash$76kSite keeps every stream$BORROW THE NET COSTLoan=$0 down; incentives pay principalborrows $168k−$24k a year for 10 years8% interest+$24k a year, netsame savings and pay as cash−$77k of interestover the loan term10-year net cash−$1kCash-flow testTHIRD-PARTY OWNERShared savings=$0 capitaldeveloper owns the battery+$3k a yeara guaranteed 15% of demand savings=Developer keeps Fast DR payand the federal credit=Needs about 12% lower costor a larger site, for an 8% return=15-year contractdeveloper carries upkeep and risk10-year net cash$29kPositive cash, if offeredCumulative cash to the site, years 0–10−$200k−$150k−$100k−$50k$0k$50k$100kyr 0yr 2yr 4yr 6yr 8yr 10Cashowns the batteryShared savingsdeveloper owns the batteryLoanowns the battery$77k of loan interestCash pays $168k net on day one
Illustrative, undiscounted. Loan at 8% over 10 years on cost after the federal credit. The battery service assumes a guaranteed 15% share of savings over a 15-year contract, an illustrative floor; at the modeled cost the developer would earn less than 8%, so a deal like this needs a lower cost or a larger site. The first 10 years are shown. Sources below.

The developer’s side

The site’s line above is only half of the deal. The developer pays the full $240k, carries maintenance, insurance and performance risk, and prices all of it into the contract to earn a return on its capital (Morgan Lewis). Third-party storage contracts usually run 15 years or more (Peak Power), and lenders treat 15- to 20-year terms as financeable (Illinois Power Agency). The chart below values each deal from the developer’s side.

What the developer earns

Present value of what the developer receives, as a share of what it spends, by contract terms.

Swipe to see the full chart →

0%50%100%150%25% to the site, 10 yearsa short contract83% · $216k vs $259k25% to the site, 15 yearssame split, longer term89% · $244k vs $275k25% to the site, 20 yearswith augmentation in year 1192% · $257k vs $278k15% to the site at $211k15 years; installed cost 12% lower100% · $242k vs $243kCovers full costFederal credit, soldDepreciation tax valueFast DRDeveloper share of demand savings
Illustrative. Present value at an 8% after-tax return with a 27% combined tax rate; past the dashed line the developer earns at least 8%. Federal credit sold at 92 cents per dollar; storage still qualifies (Plante Moran). First-year depreciation on cost less upfront incentives and half the credit, which needs tax appetite (Ferrius Energy). Costs include maintenance plus 1% of installed cost a year for insurance and asset management. Savings held flat, with rate increases offsetting battery fade; the 20-year case adds a 10% augmentation in year 11.

With 25% of savings left to the site, a 15-year deal covers about 89% of the developer’s cost on our model. At the modeled cost, a developer cannot earn 8% and still leave the site a share of demand savings. Battery-service offers are not priced the other way around, as a fee on top of handing over the savings: shared-savings providers promote a guaranteed share from day one (Gridwealth Electric), and Peak Power’s projects in Westchester, New York, split bill savings and market revenue with the building owner (NYSERDA case study). A deal that cannot fund a share is usually not offered at all. A guaranteed 15% share would need an installed cost about 12% lower, near $211k, or a larger site where cost per kWh falls; providers such as Peak Power focus on facilities with more than 1 MW of load (Peak Power’s overview). The battery-service line above shows that 15% share. A demand charge this high makes Oahu one of the stronger cases for a business battery, even without a market to sell into.

Where Hawaiian Electric goes next

Hawaiian Electric’s grid services portfolio is in flux. OATI’s agreement was extended into 2026 but remains short of its contracted capacity, and Swell’s agreements were terminated in January 2025 (Hawaiian Electric’s 2026 CER filing; see our OATI profile). Hawaiian Electric expects commercial projects to take a larger share of BYOD Plus in 2026 (CER goals report).

The future of VPP to grow at scale will depend on multiple assets in unison at any given site: building controls, chilled water and water heaters, EV charging and batteries, dispatched together. For businesses in Hawaii, the next steps are time-of-use business rates that reward shifting, a Fast DR redesign that passes its cost test, and a grid services contract that replaces the lost aggregator capacity.

Compare: the Hawaiian Electric residential deep dive for BYOD Plus at home, and the Austin Energy C&I deep dive for a utility inside a wholesale market.

Method and caveats

An independent, hypothetical analysis for business owners, facility managers, program designers, developers and other readers in Hawaiian Electric territory. Terms checked October 30, 2026.

Assumptions for the hypothetical battery: 100 kW / 400 kWh at $600 per kWh; $15 per kW-year maintenance; Oahu Schedule P at $32.04 per kW-month and 35.44¢ per kWh, with 50 kW off the monthly peak; Fast DR at $5 per kW-month on 100 kW plus 13 event hours at 50¢ per kWh, assuming the battery is accepted; BYOD Plus at $400 per kW with 200 kWh a day of cycling at 90% round-trip efficiency; federal credit at 30%. Bill shares assume 730 hours a month. The developer figures price a 15-year third-party agreement at an 8% after-tax return.

Figures are gross savings and program payments before taxes on savings, financing and degradation. Gross payments are not net profit. Fast DR is event-based demand response, not an orchestrated VPP; BYOD Plus is a scheduled daily dispatch. Stacking needs care, depending on M&V methodology.

VPP Economics has no affiliation with, sponsorship from, or endorsement by Hawaiian Electric, the Hawaii PUC, Hawaii Energy, OATI, Shifted Energy or any company named here.

Sources

Hawaiian Electric and the PUC

  1. Hawaiian Electric — Power facts by island
  2. Hawaii PUC — Electric utilities and island grids
  3. Hawaiian Electric — Wildfire safety symposium slides: five island grids
  4. Hawaiian Electric — 2026 annual customer energy resources report
  5. Hawaiian Electric — 2025 annual CER goals report
  6. Hawaiian Electric — Monthly CER report, June 2026
  7. Hawaiian Electric — Emerging technologies scorecard
  8. Hawaiian Electric — Customer incentive programs and status

Rates

  1. Hawaiian Electric — Effective rate summaries, October 2026
  2. Hawaiian Electric — Effective rate summaries, July 2026
  3. Hawaiian Electric — Oahu energy cost recovery filing, October 2026
  4. Hawaiian Electric — Oahu energy cost recovery filing, February 2026
  5. Hawaii PUC — Advanced rate design track

Business programs

  1. Hawaiian Electric — Fast Demand Response
  2. Hawaiian Electric — Commercial demand response program rules
  3. Hawaiian Electric — Fast DR incentive FAQ
  4. Hawaiian Electric — Bring Your Own Device Plus
  5. Hawaiian Electric — Rule 33, grid services (BYOD)
  6. Hawaiian Electric — Power Partnership programs
  7. Hawaii Energy — Power Move commercial energy storage rules, 2024
  8. Hawaii Climate Portal — Hawaii Energy commercial rebates, 2025–2026

Costs and finance

  1. Solar Cost Data — Energy tax credits in 2026
  2. Peak Power — Financing strategies for battery storage (third-party contract terms)
  3. Illinois Power Agency — Energy Storage Procurement Report (financeable contract tenors)
  4. Morgan Lewis — Shared-savings contract structures for energy storage
  5. Plante Moran — Battery storage investment tax credit after 2025
  6. Ferrius Energy — Storage depreciation and basis reduction

Keep going