The short answer
- PSE’s business flexibility is traditional demand response. Flex C&I, launched in November 2023 and run with Enel and Uplight, had about 528 business customers by April 2026. It pays up to $130 per kW a year for cutting load in about 10 events a year of one to four hours.
- Participants curtail loads they already have. Most sites respond through existing building automation and controls: HVAC setbacks, lighting, refrigeration and cold storage, pumps, and industrial processes shifted by a few hours. Few have batteries of a useful size, and PSE offers no business battery incentive.
- PSE’s VPP is in its early stages. PSE needs about 500 MW of flexible load by 2030 against about 129 MW today. Its 2026 demand response request for proposals invites turnkey programs, and its VPP platform targets 33 MW of directly connected batteries by the end of 2027. Little involving business batteries has been deployed yet.
- A battery is a demand-charge play. Hypothetically, a 100 kW battery that shaves the monthly peak and enrolls its remaining power in Flex C&I pays back in about 12 years with the federal credit.
What each Puget Sound Energy program is
PSE’s service area around Puget Sound is where Washington’s load growth is concentrating. In 2025, requests from new loads over 20 MW added up to almost half of PSE’s current peak, driven by data centers, tech campuses, manufacturing and multifamily development, according to a PSE presentation. Many are speculative: of 27 inquiries in one PSE filing, 17 had withdrawn, and 590 MW of the remaining 897 MW were data centers, mostly in King County, as Halcyon reported. Western planners raised PSE’s 2028 peak forecast by about 11%, from 4.4 to 4.9 GW.
Against that, PSE’s business flexibility today is conventional demand response. On February 12, 2025, PSE’s programs delivered a record 80 MW in a single event, according to its 2025 Climate Action Update. Medium and large sites take service on Schedule 25 (50–350 kW) or Schedule 26 (over 350 kW), which bill a large share of cost by demand, and they enroll curtailable load in Flex C&I. Small businesses can join Flex for Business.
PSE business programs and rates
Flex C&I
Up to $130 per kW a year, combining a standby capacity payment with performance across a season’s events. Open to Schedules 7A, 24, 25, 26, 31, 35 and 49. Enel runs a Peak Demand option of about 8 events a year at 120 minutes’ notice and an Emergency option of about 2 at 60 minutes, each one to four hours, 6 a.m.–10 p.m.
Flex for Business
For small and medium sites on Schedules 24 and 25, usually through smart thermostats: $50 to enroll, $1 per kWh reduced and $35 per kW each season.
Schedules 25 and 26
Schedule 26: $17.47 per kW-month October–March and $10.26 April–September, after a $3.90 decoupling credit. Schedule 25 charges $16.69 and $11.00 for demand above the first 50 kW. Energy is flat on Schedule 26 at about 12.2¢ per kWh with riders.
Value per kW of flexible capacity
Value per kW-year by source
What one kW of reliable reduction is worth a year at a PSE business site.
Swipe to see the full chart →
For most participants, Flex C&I value comes from load they can drop for a few hours with no new equipment: raising cooling setpoints through the building automation system, dimming lighting, coasting refrigeration and cold storage, idling pumps, or rescheduling a production run. The capacity payment is earned on what the site commits and then delivers, so the work is in planning the curtailment, not in buying hardware.
Demand charges are a separate and larger value per kW, and because PSE bills the monthly maximum at any hour, a site has to know when it will peak to cut them. That is where a battery could fit.
Stacking needs care, depending on M&V methodology. Flex C&I measures reduction against the site’s own baseline, so a battery that already shaves the monthly peak on an event day would mostly lower the baseline rather than earn event pay. In the hypothetical below, we count Flex C&I only on the 40 kW of battery power not used for shaving, at the advertised maximum.
The capital stack
Ten-year capital stack
Federal credit plus 10 years of avoided demand charges and program pay, in dollars, against the battery’s installed cost plus 10 years of maintenance.
Swipe to see the full chart →
Hypothetically if investing in battery storage and leveraging that as primary program asset, with the federal credit, the stacked case covers about 88% of cost over 10 years, better than Portland General Electric’s Oregon case because PSE bills demand at any hour and has no long on-peak window. Without the credit, demand shaving alone covers only about 39%.
Simple payback with battery
Years to repay a hypothetical battery’s net cost from avoided demand charges and program pay, net of maintenance. Bars are capped at 40 years.
Swipe to see the full chart →
Assets and combinations
Flex C&I is resource-neutral: Enel works out what each site can curtail, writes the plan and handles measurement. PSE does not publish a business battery program or incentive, so almost all enrolled capacity is existing load.
Building automation
Offices, retail, schools and churches raise setpoints, pre-cool and dim lighting through existing controls. The most common route.
Process load shifting
Manufacturers move production, grinding, pumping or compressed-air loads out of event hours. Enel says many simply shift processes by a few hours.
Refrigeration and cold storage
Cold stores pull temperatures down before an event and coast through it, using the product as thermal storage.
Fleet charging
Depots that charge overnight can pause or slow chargers during a daytime event, if the vehicles are not needed.
Battery, hypothetical
Shave the monthly peak, and commit the rest of the battery’s power to events. Rare today, and the case rests on demand charges.
Small sites
$50 to enroll, $1 per kWh and $35 per kW a season on Schedules 24 and 25.
Program example: Trident Seafoods in PSE’s business demand response program (now Flex C&I)
Trident Seafoods, one of the largest seafood companies in North America, enrolled its Anacortes processing and cold-storage plant midway through the 2023–24 winter season. PSE introduced Trident to Enel, then its exclusive demand response partner for business customers. Enel tested the plant’s equipment, wrote an energy reduction plan, handled metering, measurement and payments, and sent event notices by email, text and phone, so the plant needed no new capital, according to Enel’s case study.
The plan used the plant’s refrigeration as storage: shut off evaporators, unload and then stop the main cold-storage compressor, and pull the temperature back down overnight. Trident committed 178 kW to the Peak Demand option and 464 kW to the Emergency option, delivered 100% of its nominations, and was set to receive about $27,300 for a partial season. It separately cut energy use about 8% through an efficiency project. Other early partners included Americold, Lineage, Walgreens, Target, Michaels, Keurig Dr Pepper, AMC Theatres, E&E Foods and Overlake Christian Church, and the program beat its 5 MW first-year target, according to PSE’s Resource Planning Advisory Group summary.
That is how demand response can lead to a VPP. Enel can install controls that let it switch enrolled loads remotely, turning a phone-call curtailment into automated demand response, according to Enel. PSE’s VPP platform is built to integrate sites of up to 5 MW, and PSE plans 33 MW of directly connected batteries by the end of 2027, according to its Climate Action Update. The same plan, meters and contracts that a cold store uses for 10 events a year are the starting point for dispatching flexible load and batteries more often.
Why policy will have to move
PSE’s load growth and its 10% flexibility mandate arrive together. Simple demand response from curtailable load and thermostats has carried PSE so far, but resources that can be dispatched for hours on winter mornings and evenings, with predictable performance, are what the mandate needs most, and today’s rates and programs do not pay for that.
10% of peak from 2030
Washington’s 2024 decarbonization law for large gas-and-electric utilities requires PSE to hold flexible load equal to 10% of peak. PSE puts that at about 500 MW available year-round, against roughly 129 MW today, and has a demand response request for proposals open to close the gap.
Large loads near half of peak
In 2025, requests from loads over 20 MW added up to almost 50% of PSE’s current peak, driven by data centers, tech campuses, manufacturing and multifamily buildings. Many are speculative, and PSE is building a new large-load process.
1,556 MW of winter peak by 2031
PSE’s 2026 rate case testimony estimates that much new winter peak capacity by 2031. Its 2027 Integrated System Plan, due April 1, 2027, will set the resource mix, including how much comes from customer devices.
Keeping the Flex C&I pay and 75% of the demand savings, the developer falls well short at every term: about 67% at 10 years and 73% at 20. At the modeled cost, a developer cannot earn 8% and still leave the site a share of demand savings. Battery-service offers are not priced the other way around, as a fee on top of handing over the savings: shared-savings providers promote a guaranteed share from day one (Gridwealth Electric), and Peak Power’s projects in Westchester, New York, split bill savings and market revenue with the building owner (NYSERDA case study). A deal that cannot fund a share is usually not offered at all. A guaranteed 15% share would need an installed cost about 50% lower, near $119k, well below today’s prices, so here a deal depends more on new program pay than on cheaper batteries; larger sites help, and providers such as Peak Power focus on facilities with more than 1 MW of load (Peak Power’s overview). The gap is revenue a capacity market would fill elsewhere. The Northwest has none: PSE has committed to the Western Resource Adequacy Program, in which utilities show and trade capacity among themselves, from winter 2027–28, according to the Western Power Pool, and has agreed to join Southwest Power Pool’s Markets+ day-ahead energy market, as RTO Insider reported. Neither pays a business battery for capacity.
The policy lever is PSE’s own procurement. To reach about 500 MW of year-round flexible load by 2030, PSE’s 2026 demand response request for proposals invites turnkey programs, and an aggregator contract that pays per kW for a fleet of business batteries would give a developer the long-term revenue this model lacks. Even so, capacity pay alone does not close the gap: in our model, $130 per kW on the full 100 kW on top of the demand savings lifts the 10-year ratio only to about 82%. Reaching break-even would also take an upfront incentive, as Connecticut and New York offer, or lower battery prices.
Four changes would move business flexibility beyond event-based curtailment. A business battery track that pays for metered discharge at the device, as Flex Batteries does for homes, would remove the baseline conflict with demand shaving. Multiyear per-kW contracts of five to ten years, awarded through the demand response request for proposals, would give aggregators and site owners revenue they can finance against.
Large loads are the third. PSE lists load flexibility as an opportunity with large-load developers in its large-load presentation, and on-site batteries or flexible computing at data centers and campuses that respond to PSE peaks could count toward the 500 MW. Finally, business energy prices that vary by time of day would reward shifting process loads and charging fleets overnight every day, not only in events, and would give a battery a second daily revenue stream beyond demand charges.
What ifs
Closer to realized pay
At $65 per kW-year, a hypothetical battery’s stacked payback rises to about 15 years. For curtailed load with no capital, half the pay is still found money.
From calls to dispatch
Remote switching through Enel or a building automation link lets a site respond to more events, with less staff effort, and is what a VPP contract would require.
The biggest battery lever
At $400 per kWh, the stacked battery payback falls to about 8 years.
Construction-start deadlines
Losing the credit adds about $72k to a hypothetical battery’s net cost.
A rider, not a rate
Schedule 26’s demand charge includes a $3.90 per kW-month decoupling credit, about $47 per kW-year, that can change with each true-up.
Same value per kW
Schedule 25 demand charges are nearly identical per kW above the first 50 kW, so demand-charge savings per kW hold for sites from about 110 to 350 kW.
Compare: Puget Sound Energy residential, Portland General Electric C&I for Oregon and Xcel Energy C&I for Colorado.
Method and caveats
An independent, hypothetical analysis for business owners, facility managers, program designers, developers and other readers in Puget Sound Energy’s Washington service area. Terms checked October 28, 2026.
Assumptions for the hypothetical battery: 100 kW / 400 kWh at $600 per kWh; $15 per kW-year maintenance; 60 kW off the monthly maximum demand on Schedule 26 secondary service; Flex C&I at its advertised $130 per kW-year on the remaining 40 kW, assumed available for the contract term; no upfront incentive. The developer figures in the policy section price a 15-year battery service at an 8% after-tax return.
Customer counts and capacity from PSE’s 2026 demand response request for proposals and Climate Action Update. Trident Seafoods figures are as reported by Enel. Energy, reactive power and backup value are excluded. Gross payments are not net profit. Flex C&I is event-based demand response, not a continuously orchestrated VPP.
VPP Economics has no affiliation with, sponsorship from, or endorsement by Puget Sound Energy, Enel, Uplight, GridBeyond, Trident Seafoods, Americold, Lineage or any company named here.
Sources
Puget Sound Energy programs and rates
- PSE — Flex C&I business demand response
- Enel — PSE Business Demand Response FAQ
- Enel — Puget Sound Energy demand response program
- PSE — Flex for Business
- PSE — Summary of electric prices, October 1, 2026
Load growth, markets and policy
- PSE — 2026 demand response request for proposals
- PSE — 2025 Climate Action Update
- PSE — Resource Planning Advisory Group meeting summary, April 2024
- PSE — Large loads presentation, April 2026
- Halcyon — PSE large-load inquiries table
- PSE — 2026 rate case testimony on capacity need (Steuerwalt)
- WECC — Large load interconnection risk assessment
- Bellevue 2030 District — The grid is changing
- Western Power Pool — WRAP participants committed to binding operations
- RTO Insider — PSE agrees to join Markets+
Program partners, costs and analysis
- Enel — Trident Seafoods demand response case study
- GridBeyond — Demand response with GridBeyond and Uplight in Washington
- Sidley — Federal clean energy credit changes
- NY DPS — 2026 State of Storage report (cost benchmark)
- Peak Power — Financing strategies for battery storage (third-party contract terms)
- Illinois Power Agency — Energy Storage Procurement Report (financeable contract tenors)
- Morgan Lewis — Shared-savings contract structures for energy storage
- Plante Moran — Battery storage investment tax credit after 2025
- Ferrius Energy — Storage depreciation and basis reduction