Utility program deep dive · Oregon
Portland General Electric C&I battery, demand charge and VPP economics
How Energy Partner, Schedule 83 and 85 demand charges and Energy Trust of Oregon incentives stack up for a business battery.
VPP Economics has no affiliation with, sponsorship from, or endorsement by any utility, aggregator, platform, or device maker named here.
The short answer
- PGE business demand charges are high, but the window is long. On Schedule 85, charges set by monthly on-peak demand total about $16.17 per kW-month, and on-peak runs 6 a.m. to 10 p.m. Monday through Saturday. A four-hour battery can trim a short spike, not a flat 16-hour load.
- Energy Partner pays modestly for event capacity. PGE’s On Demand option pays a monthly reservation per kW by window, notice and hours; covering 4–8 p.m. for up to 40 hours a season is worth about $31 per kW-year with energy payments. Its baseline uses the five highest of the last 10 typical days.
- Energy is cheap, so arbitrage is thin. Schedule 85 energy runs about 5.9¢ to 7.8¢ per kWh across periods, a spread too narrow to pay for daily cycling.
- The verdict: a battery is hard to justify on bill savings alone. With the 30% federal credit and Energy Trust’s $9,000 cap, our Schedule 85 case pays back in about 19 years. Curtailable load in Energy Partner, with no capital, is the more reliable earner.
What each Portland General Electric program is
PGE’s business flexibility is built around Energy Partner, a demand response program that has run since 2020 and is part of the roughly 600 MW of flexible load PGE counts today (PGE). Energy Trust of Oregon pays upfront for business solar and storage, and Oregon has no state business battery rebate. Medium and large sites take service on Schedule 83 (31–200 kW) or Schedule 85 (201–4,000 kW), which bill most of their cost by demand.
Energy Partner On Demand
Schedule 26 pays a monthly reservation per kW for summer (June–September) and winter (November–February) windows, at 18-hour, 4-hour or 10-minute notice and 20, 40 or 80 event hours a season, plus a Mid-C energy payment per MWh reduced. Diesel and gas generation cannot be used.
Energy Partner Smart Thermostat
$100 per site at enrollment plus $60 per site each season for small and medium businesses with qualifying thermostats.
Energy Trust business storage
$300 per kWh up to $9,000 for business batteries through Energy Trust’s solar program, plus up to $3,000 in development assistance for storage projects.
Value per kW of flexible capacity
Value per kW-year by source
What one kW of reliable reduction is worth a year at a PGE business site.
Swipe to see the full chart →
Demand charges are the largest value per kW, but only on paper for a battery. Because on-peak demand is the highest reading across a 16-hour window, six days a week, a 400 kWh battery can hold down a peak of 100 kW for four hours or 50 kW for eight. We assume 50 kW, which needs a site whose peak is short and predictable.
Stacking needs care, depending on M&V methodology. Energy Partner measures reduction against a baseline built from the five highest-load days among the last 10 typical days. A battery that already shaves those days lowers its own baseline, so we do not stack Energy Partner with daily demand shaving.
The capital stack
Ten-year capital stack
Incentives plus 10 years of avoided costs and program pay as a share of installed cost plus 10 years of maintenance. Past the dashed line, the package more than covers its cost.
Swipe to see the full chart →
Even with the federal credit, the best Schedule 85 case covers about 70% of cost over 10 years. Energy Partner alone covers mostly what the incentives cover, about 44%. PGE business batteries make sense where backup power, a solar project or a short, sharp peak is already driving the decision.
Simple payback
Years to repay net cost from avoided costs and program pay, net of maintenance. Bars are capped at 40 years.
Swipe to see the full chart →
Assets and combinations
Energy Partner covers curtailable building load, thermostats and on-site batteries; it excludes fossil-fueled backup generators. Energy Trust’s business storage incentive runs through its solar program.
Solar + storage
The battery trims short on-peak spikes and holds solar for backup.
Battery only
A four-hour battery fits the 4–8 p.m. windows at any notice period. Wider windows need longer duration.
Curtailable load
Industrial processes, refrigeration and HVAC can commit to all-windows pricing with no capital, measured against the baseline.
Small sites
$100 at enrollment plus $60 per season, per site.
Financing and ownership
Own, borrow or buy a battery service
A 100 kW / 400 kWh battery at a PGE Schedule 85 site with demand shaving.
Swipe to see the full chart →
The developer’s side
The site’s line above is only half of the deal. The developer pays the full $240k, carries maintenance, insurance and performance risk, and prices all of it into the contract to earn a return on its capital. That is why third-party storage contracts usually run 15 years or more, and why lenders treat 15- to 20-year terms as financeable. The chart below values each deal from the developer’s side.
What the developer earns
Present value of what the developer receives, as a share of what it spends, by contract terms.
Swipe to see the full chart →
Even keeping every dollar of demand savings for 20 years, the developer falls short. The 16-hour on-peak window limits what a four-hour battery can shave, and Oregon has no capacity auction to fill the gap: capacity in the Northwest is planned through utility resource plans and the Western Resource Adequacy Program, in which utilities show and trade capacity among themselves, so a business battery has nothing to bid into. At the modeled cost, a developer cannot earn 8% and still leave the site a share of demand savings. Battery-service offers are not priced the other way around, as a fee on top of handing over the savings: shared-savings providers promote a guaranteed share from day one (Gridwealth Electric), and Peak Power’s projects in Westchester, New York, split bill savings and market revenue with the building owner (NYSERDA case study). A deal that cannot fund a share is usually not offered at all. A guaranteed 15% share would need an installed cost about 69% lower, near $75k, well below today’s prices, so here a deal depends more on new program pay than on cheaper batteries; larger sites help, and providers such as Peak Power focus on facilities with more than 1 MW of load (Peak Power’s overview). The battery-service line above shows that 15% share.
Two PGE programs could add revenue. Energy Partner pays about $31 per kW-year at 4–8 p.m. but, as above, does not stack cleanly with daily shaving. Schedule 200, Dispatchable Standby Generation, is open to batteries of 250 kW and 750 kWh or more. Its $137.40 per kW-year rate for demand response plus reserves sets how much PGE will fund toward the switchgear, controls and wiring needed to dispatch the battery; it is not a yearly cash payment, and leaving early means repaying part of PGE’s capital.
Additional Finance Options and Considerations
Long payback
Net cost about $159k after incentives, repaid from about $8k a year.
Negative cash flow
Payments of about $23k a year exceed about $8k of annual value.
Pays for resilience
No capital and a share of demand savings, but only where a lower installed cost or a larger site lets the developer fund it. Backup power is a bonus.
250 kW and 750 kWh or more
PGE funds integration equipment up to $137.40 per kW-year for demand response plus reserves, toward a battery large enough to qualify.
What ifs
More than 950 MW by 2028
PGE’s plan to grow flexible load could raise business program pay or add battery-specific options.
The biggest lever
At $400 per kWh, the Schedule 85 payback falls to about 13 years.
More kW shaved
If the battery could shave the full 100 kW, demand savings would double to about $19k a year.
Construction-start deadlines
Losing the credit adds about $72k to the net cost.
Longer duration
An eight-hour battery or a battery plus curtailable load could earn all-windows pricing of about $75 per kW-year.
A possible extension
PGE’s residential battery pilot pays per kWh discharged with no baseline. A business version would remove the stacking conflict with demand shaving; none is proposed today.
Compare: Portland General Electric residential, Xcel Energy C&I and PG&E C&I for California.
Method and caveats
An independent, hypothetical analysis for business owners, facility managers, program designers, developers and other readers in Portland General Electric’s Oregon service area. Terms checked October 28, 2026.
Assumptions: 100 kW / 400 kWh battery at $600 per kWh; $15 per kW-year maintenance; 50 kW off monthly on-peak demand on Schedule 83 or 85 secondary service; Energy Partner at 4-hour notice, 4–8 p.m., 40 hours a season in both seasons; Energy Trust at $300 per kWh capped at $9,000.
Energy, facility-charge and backup value are excluded. Figures are illustrative avoided costs and gross payments before financing, degradation and augmentation. Gross payments are not net profit.
VPP Economics has no affiliation with, sponsorship from, or endorsement by Portland General Electric, Energy Trust of Oregon or any company named here.
Sources
Portland General Electric programs and rates
- PGE — Energy Partner program
- PGE — Schedule 26, Energy Partner On Demand tariff
- PGE — Advice 25-42, Schedule 26 energy payment update
- PGE — Energy Partner Smart Thermostat
- PGE — Business pricing plans
- PGE — Price summary, standard service schedules (July 8, 2026)
- PGE — Tariff update effective April 1, 2026
- PGE — Schedule 83 and 85 tariff sheets with on-peak hours (UE 416)
- PGE — Flexible load multi-year planning
- PGE — Schedule 200, Dispatchable Standby Generation tariff
Energy Trust of Oregon and policy
- Energy Trust of Oregon — Solar and storage incentives
- Energy Trust of Oregon — Solar program update, October 2026 forum
- Clean Energy States Alliance — VPP program summary table
Prices, costs and analysis
- Sidley — Federal clean energy credit changes
- NY DPS — 2026 State of Storage report (cost benchmark)
- Grant PUD — 2026 Integrated Resource Plan (Western Resource Adequacy Program overview)
- Peak Power — Financing strategies for battery storage (third-party contract terms)
- Illinois Power Agency — Energy Storage Procurement Report (financeable contract tenors)
- Morgan Lewis — Shared-savings contract structures for energy storage
- Plante Moran — Battery storage investment tax credit after 2025
- Ferrius Energy — Storage depreciation and basis reduction